February 2022 – City Reports on Measure T1
The City has sent out a 16-page illustrated brochure about how the 2016 Infrastructure Bond Measure T1 has been spent so far. Under “Planning Studies” is the following entry about the Civic Center Area:
It’s a little worrisome that the drawing includes the Council Chamber addition to the 2180 Milvia building that our group has strongly opposed.